The expansion project of the Ring Road was implemented over a length of
3 km in both directions from Mastroud to El-Khosous, including the
expansion of 3 tunnels and the construction of a 1 km concrete slab as
part of the expansion. Additionally, the existing road was widened through
concrete and road works.